Skip to content
Rental properties

Preparing a rental unit between tenants

A turnover that runs in the right order takes days, not weeks. Here is the sequence we follow.

2 min read
Photo: freshly painted apartment ready for a new tenant, 16:9, 21:9

Every day a unit sits empty costs rent, and most turnover delays come from the order of the work rather than its size. A turnover that runs in the right sequence takes days, not weeks.

Walk the unit on move-out day

Inspect the unit as soon as the keys come back, with the move-in report and photos in hand. Note wear and damage room by room, and decide what is normal wear and what goes against the deposit while the details are fresh.

One list, one price

Put everything on one list: repairs, paint, flooring, appliance checks and cleaning. One priced list means one approval, and no trade waits for a decision. It also becomes the standard scope for the next turnover in the same building.

Work in the right order

  • Repairs first: drywall, doors, cabinets, fixtures and anything behind a wall

  • Paint second, once every patch is dry and sanded

  • Flooring third, so paint never drips on new floors

  • Appliance checks and replacements before the final clean

  • Cleaning last, after every other trade has left

Check what tenants notice first

  • Smoke and carbon monoxide alarms tested, with fresh batteries

  • Every light, outlet cover and door handle working

  • Faucets, toilets and drains running without leaks

  • Windows and locks opening and closing smoothly

Photograph the finished unit

Take dated photos of every room when the work is done. They serve the listing and the next move-in report, and they protect both sides when the next tenant moves out.

Was this article useful?

Professional results. Proudly serving Washington, D.C., Maryland & Virginia.